EQUIPMENT
Additional Information
FABRICATION
- Quality control- fittings and assemblies are moved and checked off in our production console as it moves through different production processes in the shop.
- Approx. 50,000 SQFT of shop space
- 5 acres of storage yard
- 3- 7.5 ton bridge cranes
- 5- 5 ton bridge crane
- Proweld- stud machine for shooting studs on embeds
- Peddinghaus 643Q Angle Master
- Peddibot robotic Plasma cutter
- Peddinghaus PCD-1100/3C ATC Advantage W/ tandem 1250DG MITER SAW
- Koike Aronson- Hypertherm Matstergraph Extreme Plasma Cutting system
- cuts up to 2 1/2" thick plate using the plasma cutter and 6" thick using oxy torch
- True hole technology for precise cutting of holes
- Adira 300 ton press break-16 ft wide
- Bend-Tech Dragon A400
- 2-Gika iron workers
- Hem Saw- 16" capacity horizontal band saw
- 12- wire fed miller welders
- miller tig machine
- International haul truck
- F-350 haul truck w/ flatbed
- 1- 45ft flatbed trailers
- 1-48ft flatbed
- 1- 48' that stretches to 90'
- 1- 45ft drop deck trailer
- 1- 35 ft gooseneck trailer
- 1- 20 ft flat bed trailer
- 1- warehouse forklift
- 2- forklifts to load trailers
ERECTION
- 75 ton Linkbelt Crane
- 110 TON Linkbelt Crane
- 18 ton Elliot Crane truck
- 6- Crews for structural steel erection with all tools necessary for job completion
- 1- rail installation crew (site rail, steel, stainless steel)
- 2- core drilling machines for site rail installation
- 2-portable miller tig welding machines
- 18- welder/ generators
- We shoot our own composite floor studs down